Construction Management

Construction Management

SERVICES  Construction Supervision Contract Management PROJECTS Camaligan Fish Port Project   Navotas Fish  Port Project Sual Fishport Project Zamboanga Fish Port JICA Funded – Pasig-Marikina River Channel Improvement Project (PMRCIP), Phases I, II, III, & IX (In association with)

Clustering spatio–seasonal hydrogeochemical data using self-organizing maps for groundwater quality assessment in the Red River Delta, Vietnam

The Red River Delta (RRD) is the second largest delta in Vietnam, and its local communities depend on groundwater sources for water supply. A clear understanding of the groundwater hydrogeochemical properties, particularly their changes from the dry to rainy seasons and spatial characteristics, is invaluable and indispensable for the management and protection of this important water resource. …

Hydrogeochemical characteristics of groundwater from the two main aquifers in the Red River Delta, Vietnam

In the Red River Delta, situated in the northern part of Vietnam, nearly its entire population depends solely on groundwater for daily water consumptions. For this reason, groundwater quality assessments must be carefully carried out using hydrogeochemical properties, to ensure effective groundwater resource planning for the Delta’s present and future groundwater use. In this study, …

Environmental impact assessment using a utility-based recursive evidential reasoning approach for structural flood mitigation measures in Metro Manila, Philippines

Highlights   • An evidential reasoning approach was used in the EIA of flood control projects. • New utility functions for the evidential reasoning approach were developed. • The new utility functions are based on the concept of “gains and losses”. • The overall environmental impact of each SFMM was effectively characterized. • The new …

Environmental impact assessment of structural flood mitigation measures by a rapid impact assessment matrix (RIAM) technique: A case study in Metro Manila, Philippines

Highlights • The RIAM is used in the EIA of flood control projects in the Philippines. • Project phasing is proposed as additional feature in the RIAM method. • A slight modification in the B criteria and range bands of the RIAM was proposed. • The modified RIAM provides highly organized and more meaningful EIA results. • …

HIGHLIGHTS OF THE MWSS RO 5TH RATE REBASING PUBLIC CONSULTATION DRIVE

WATCH: Highlights of the MWSS Regulatory Office (RO) 5th Rate Rebasing Public Consultation Drive (PCDr) held on 20 and 22 July 2022 for the West Zone, and 25 and 27 July 2022 for the East Zone The PCDr—which was hosted by the local governments of Manila City, Parañaque City, Rizal Province, and Marikina City—became a venue for discussing …

DPWH Kicks-Off JICA-Funded Mindanao Road Network Project

The Department of Public Works and Highways (DPWH) is now working on projects that will address the deficit of road network in the Bangsamoro Autonomous Region in Muslim Mindanao (BARMM). Simultaneous to DPWH Senior Undersecretary Emil K. Sadain’s participation at the 12th Intergovernmental Relations Body (IGRB) Meeting of the National Government and Bangsamoro Government in …

DPWH to Push for Comprehensive Flood Control Program in Central Luzon

The Department of Public Works and Highways (DPWH) is presently working on the development of design plan for the first major project proposal under President Ferdinand Romualdez Marcos Jr. administration to curb flooding in Pampanga and Bulacan. In his report to DPWH Secretary Manuel M. Bonoan, Senior Undersecretary Emil K. Sadain said that the planning …

Flood Risk Management Project (FRIMP) for Ylang-Ylang River and Rio-Grande River in the Province of Cavite

WCI was commissioned to undertake the Environmental and Social Safeguards activities for the Flood Risk Management Project (FRIMP) for Ylang-Ylang River and Rio-Grande River in the Province of Cavite. This DPWH project involves the construction of two retarding basins in General Trias, Cavite. Retarding Basin I is approximately 48 hectares while Retarding Basin II is …