Construction Management

Construction Management

SERVICES  Construction Supervision Contract Management PROJECTS Camaligan Fish Port Project   Navotas Fish  Port Project Sual Fishport Project Zamboanga Fish Port JICA Funded – Pasig-Marikina River Channel Improvement Project (PMRCIP), Phases I, II, III, & IX (In association with)

Clustering spatio–seasonal hydrogeochemical data using self-organizing maps for groundwater quality assessment in the Red River Delta, Vietnam

The Red River Delta (RRD) is the second largest delta in Vietnam, and its local communities depend on groundwater sources for water supply. A clear understanding of the groundwater hydrogeochemical properties, particularly their changes from the dry to rainy seasons and spatial characteristics, is invaluable and indispensable for the management and protection of this important water resource. …

Hydrogeochemical characteristics of groundwater from the two main aquifers in the Red River Delta, Vietnam

In the Red River Delta, situated in the northern part of Vietnam, nearly its entire population depends solely on groundwater for daily water consumptions. For this reason, groundwater quality assessments must be carefully carried out using hydrogeochemical properties, to ensure effective groundwater resource planning for the Delta’s present and future groundwater use. In this study, …

Environmental impact assessment using a utility-based recursive evidential reasoning approach for structural flood mitigation measures in Metro Manila, Philippines

Highlights   • An evidential reasoning approach was used in the EIA of flood control projects. • New utility functions for the evidential reasoning approach were developed. • The new utility functions are based on the concept of “gains and losses”. • The overall environmental impact of each SFMM was effectively characterized. • The new …

Environmental impact assessment of structural flood mitigation measures by a rapid impact assessment matrix (RIAM) technique: A case study in Metro Manila, Philippines

Highlights • The RIAM is used in the EIA of flood control projects in the Philippines. • Project phasing is proposed as additional feature in the RIAM method. • A slight modification in the B criteria and range bands of the RIAM was proposed. • The modified RIAM provides highly organized and more meaningful EIA results. • …

HIGHLIGHTS OF THE MWSS RO 5TH RATE REBASING PUBLIC CONSULTATION DRIVE

WATCH: Highlights of the MWSS Regulatory Office (RO) 5th Rate Rebasing Public Consultation Drive (PCDr) held on 20 and 22 July 2022 for the West Zone, and 25 and 27 July 2022 for the East Zone The PCDr—which was hosted by the local governments of Manila City, Parañaque City, Rizal Province, and Marikina City—became a venue for discussing …

The Sustainable Development Goals Report 2022

7 July 2022: The Sustainable Development Goals Report 2022 provides a global overview of progress on the implementation of the 2030 Agenda for Sustainable Development, using the latest available data and estimates. It tracks the global and regional progress towards the 17 Goals with in-depth analyses of selected indicators for each Goal. According to the Report, cascading …

THE 17 GOALS – Sustainable Development Goals

The 2030 Agenda for Sustainable Development, adopted by all United Nations Member States in 2015, provides a shared blueprint for peace and prosperity for people and the planet, now and into the future. At its heart are the 17 Sustainable Development Goals (SDGs), which are an urgent call for action by all countries – developed and …

DPWH Kicks-Off JICA-Funded Mindanao Road Network Project

The Department of Public Works and Highways (DPWH) is now working on projects that will address the deficit of road network in the Bangsamoro Autonomous Region in Muslim Mindanao (BARMM). Simultaneous to DPWH Senior Undersecretary Emil K. Sadain’s participation at the 12th Intergovernmental Relations Body (IGRB) Meeting of the National Government and Bangsamoro Government in …

Marawi Road Rehabilitation Moves Forward

Thursday, February 13, 2020 Pace of progress dramatically accelerated in just five (5) months since three (3) groups of Department of Public Works and Highways (DPWH) contractors commenced the reconstruction/rehabilitation of 18.97-kilometer Marawi Transcentral Road Project-Stage 1 in Lanao Del Sur.  The urgent rehabilitation of transcentral roads damaged by armed-conflict in Marawi City is part …