Consultancy Service for the Conduct of Rapid Feasibility Study and Detailed Engineering Design (DED) of Level II Independent Water Supply for Municipalities of Indanan, Maimbung, Parang, Patikul and Talipao; Detailed Design of Jolo Water Works Expansion (Phase II) and Detailed Design for the Realignment and Relocation of Transmission Pipeline in Luuk, all in the Province of Sulu under Department of Public Works and Highways – Autonomous Region in Muslim Mindanao (DPWH-ARMM)
Year: 2018
Project Description:
the study is to complete an assessment and develop a Level II water supply system with sustainable water source capacity over a 25 years for the Municipalities of Indanan, Maimbung, Parang, Patikul and Talipao, all from Province of Sulu. For Jolo, this project aims to prepare detailed design of the Jolo waterworks expansion and source development. For Luuk, this project shall provide detailed engineering analysis of the proposed relocation and realignment of the proposed 180 m3 reservoir and transmission-distribution pipe from Bual spring to the proposed reservoir.
To prepare a Rapid Feasibility Study and Detailed Engineering Design for a Level II water supply system for Municipalities of Indanan, Maimbung, Parang, Patikul and Talipao, all from Province of Sulu. To prepare detailed engineering design of the Jolo waterworks expansion and source development and Luuk reservoir relocation and transmission pipeline realignment.
The springs identified in the area were used as the primary water source for the proposed Level II water supply system in the Municipalities of Indanan, Maimbung, Parang, Patikul and Talipao. For Jolo Waterworks, Tigbao Spring will be utilized and developed as the water source while for Luuk, Bual Spring was identified as the primary water source. The following pictures presents the spring water sources to be developed for each municipality.