Environment and Social Services

Environmental Compliance Services

  • Environmental and Social Impact Assessment (ESIA)
  • Environmental Site Assessment (ESA)
  • Environmental Impact Statement (EIS)
  • Environmental Performance Report and Management Plan (EPRMP)
  • Initial Environmental Examination (IEE) Study
  • Land Acquisition Plan and Resettlement Action Plan (LAPRAP)
  • Tree Cutting Permit Application

Waste Management and Landfill Development

  • Design Engineering Design of Sanitary Landfill
  • Design and Build of Sanitary Landfill
  • Hazardous waste management
  • Detailed Engineering Design of Leachate Treatment Plan
  • Landfill Mining and Reclamation Study

Sustainable Development and Environmental Planning

  • Comprehensive Land Use Plan (CLUP)
  • Safe Closure and Rehabilitation Plan (SCRP) of Contaminated Sites
  • Land Use Conversion of Contaminated Sites
  • Provincial Development and Physical Framework (PDPFP)
  • Preparation of Regional Infra Development and Implementation Plan

Environmental Reporting and Monitoring

  • Ecological assessment (Terrestrial Flora and Fauna Survey, Aquatic Biota Survey, Tree Inventory)
  • Environmental Monitoring (Air Quality, Noise and Vibration, Water Quality)

(2015) – Feasibility Study and Preliminary Design of the Baguio Bulk Water Supply Project

(2018) – Conduct of Detailed Engineering Design (DED) of Irrigation and Drainage Network for Calapangan Small Reservoir Irrigation Project, Sto. Nino, Cagayan 

(2019) – Development of Groundwater Management Plan (GMP) for Cavite (Carmona, Dasmarinas, General Marciano Alvarez, General Trias, Imus, Rosario, Tanza, Bacoor, Naic and Trece Martinez))

(2014) – Conduct of Waste Amount and Composition Survey (WACS) in Metro Manila

(2016) – Feasibility Study of the Proposed Ilocos Sur Irrigation Projects (Ilocos Sur Transbasin Project & Upper Banaoang Irrigation Project)

(2019) – Environmental Study for Development of Resettlement Sites under Detailed Engineering Design and Construction Supervision of Cavite Industrial Area Flood Risk Management Project

(2019) – RAP Preparation / Socio-Economic Survey under Detailed Engineering Design and Construction Supervision of the Cavite Industrial Area Flood Risk Management Project

Spread the Word: Share This Post