DPWH to Push for Comprehensive Flood Control Program in Central Luzon

The Department of Public Works and Highways (DPWH) is presently working on the development of design plan for the first major project proposal under President Ferdinand Romualdez Marcos Jr. administration to curb flooding in Pampanga and Bulacan. In his report to DPWH Secretary Manuel M. Bonoan, Senior Undersecretary Emil K. Sadain said that the planning …

Sulu Water Supply Project

Consultancy Service for the Conduct of Rapid Feasibility Study and Detailed Engineering Design (DED) of Level II Independent Water Supply for Municipalities of Indanan, Maimbung, Parang, Patikul and Talipao; Detailed Design of Jolo Water Works Expansion (Phase II) and Detailed Design for the Realignment and Relocation of Transmission Pipeline in Luuk, all in the Province …

Lazatin Flyover Project GOS-Lazatin Road Intersection, San Fernando City, Pampanga

Year: 2012 Project Description: The Flyover Project to be constructed at the intersection of Gapan-San Fernando- Olongapo Road and Lazatin Road intersection in San Fernando City, is a necessary infrastructure that presents a structural solution to traffic congestion caused by lowering road capacities brought about by an urbanizing metropolis. The proposed project would serve incoming …

Lanao del Sur Water Supply Project

Consultancy Service for the Conduct of Feasibility Studies and Detailed Engineering of Level II Water Supply for the seven (7) Municipalities of Butig, Lumbatan, Bayang, Lumbayanague, Tubaran, Marogong and Lumbaca-Unayan, all in the Province of Lanao del Sur, under the DPWH-ARMM Year: 2018 Project Description: Prepare a Rapid Feasibility Study and Detailed Engineering Design for …

Flood Risk Management Project (FRIMP) for Ylang-Ylang River and Rio-Grande River in the Province of Cavite

WCI was commissioned to undertake the Environmental and Social Safeguards activities for the Flood Risk Management Project (FRIMP) for Ylang-Ylang River and Rio-Grande River in the Province of Cavite. This DPWH project involves the construction of two retarding basins in General Trias, Cavite. Retarding Basin I is approximately 48 hectares while Retarding Basin II is …

Feasibility Study of the Circumferential Road-Burgos Avenue Intersection Flyover Project Bacolod City

Year: 2011 Project Description: The proposed flyover project, to be constructed at the intersection of Circumferential Road – Burgos Avenue in Bacolod City, is a necessary infrastructure that presents a structural solution to traffic congestion and lowering road capacities brought about by an urbanizing metropolis. This feasibility study is intended to elaborate on the plan …

payatas-mound

Comprehensive Study on the Possible Land Use Conversion of the Payatas Controlled Disposal Facility (PCDF)

Year: 2017 Project Description In 2017, Environmental Protection and Waste Management Department (EPWMD) of the QC Local Government contracted Woodfields Consultants, Inc. (WCI) to carefully consider the possibility of converting the land use of the Payatas Controlled Disposal Facility (PCDF) due to the high cost of Post-Closure Care (PCC) maintenance services and the surge in …

Urban and Regional Planning

Urban and Regional Planning

LAND USE UNIT Master Planning and Spatial Analysis Urban Development Strategy Tourism Development Smart City Planning Comprehensive Land Use Plans (CLUPs), Comprehensive Development Plans (CDPs) ESTATE AND PUBLIC FACILITIES UNIT Transport Planning and Engineering Traffic Survey and Analysis Site development of proposed Public Facilities Preliminary Architectural Design Master planning, feasibility studies and preliminary engineering design …